Welcome to Dalian Huayang
    Tel:400-901-3696
    Installation Precondition for CD instrument
    • Release time : 2018-05-09 16:51:05
    • Browsing volume:9973

    Dear valued customers,
    Thank you for choosing our instrument, in order to better complete the installation and commissioning work of your purchased CD Instrument, please confirm the following readiness condition before installing.

    The following to be filled by users
    - Company name:
    - Person in charge:
    - Installation address:
    - Telephone:

    Confirm installation conditions
    1. Room temperature 15-25 ℃, RH bellow 70%,  Avoid dust, direct sunlight and maganetic field  interference.
    2. Instrument needs a stable laboratory bench space: length 120cm, width 90cm, height 80cm. If the computer is placed on the same platform, the length is needed to be lengthened correspondingly.
    3. Power supply: AC 220V+/-5%, ground wire connector.
    4. Prepare nitrogen bottle with a pressure gauge and a pressure reducing valve which is connected with a 20 L / min flow meter.

    Trainee Information
    - Name:
    - Position:
    - If trainee manipulate Windows XP
    - Whether trainee use the similar instrument

    DHSI Technical Department

    Copyright Dalian Huayang analytical instruments Co., Ltd.All right reserved. Preparation of Liao ICP
    友情鏈接: link1 link2 link3 link4 link5 link8 link9
    主站蜘蛛池模板: 博乐市| 西青区| 侯马市| 聊城市| 金门县| 张家口市| 丰原市| 东源县| 外汇| 连州市| 乌鲁木齐市| 焉耆| 铜陵市| 台南县| 镇原县| 吉安市| 怀远县| 木兰县| 鹤壁市| 桂林市| 南昌市| 健康| 三都| 措美县| 徐闻县| 桂东县| 潢川县| 蒙城县| 洛浦县| 香港| 德令哈市| 大足县| 自贡市| 右玉县| 重庆市| 松江区| 大理市| 白银市| 浦东新区| 资源县| 甘谷县|