Welcome to Dalian Huayang
    Tel:400-901-3696
    Installation Precondition for CD instrument
    • Posttime : 2018-05-09 16:51:05
    • Hits:9971

    Dear valued customers,
    Thank you for choosing our instrument, in order to better complete the installation and commissioning work of your purchased CD Instrument, please confirm the following readiness condition before installing.

    The following to be filled by users
    - Company name:
    - Person in charge:
    - Installation address:
    - Telephone:

    Confirm installation conditions
    1. Room temperature 15-25 ℃, RH bellow 70%,  Avoid dust, direct sunlight and maganetic field  interference.
    2. Instrument needs a stable laboratory bench space: length 120cm, width 90cm, height 80cm. If the computer is placed on the same platform, the length is needed to be lengthened correspondingly.
    3. Power supply: AC 220V+/-5%, ground wire connector.
    4. Prepare nitrogen bottle with a pressure gauge and a pressure reducing valve which is connected with a 20 L / min flow meter.

    Trainee Information
    - Name:
    - Position:
    - If trainee manipulate Windows XP
    - Whether trainee use the similar instrument

    DHSI Technical Department

    Copyright Dalian Huayang analytical instruments Co., Ltd.All right reserved. Preparation of Liao ICP
    友情鏈接: link1 link2 link3 link4 link5 link8 link9
    主站蜘蛛池模板: 方正县| 漳州市| 五家渠市| 逊克县| 桑植县| 南城县| 吉安市| 西平县| 无锡市| 水城县| 宜君县| 东乌珠穆沁旗| 青浦区| 抚州市| 呼玛县| 灵石县| 长岭县| 怀仁县| 涞源县| 连南| 邛崃市| 姚安县| 凯里市| 文昌市| 海伦市| 游戏| 疏附县| 湘潭县| 虎林市| 延庆县| 南部县| 九台市| 都匀市| 五原县| 定陶县| 织金县| 谢通门县| 钦州市| 宜兰县| 磴口县| 芜湖县|