Welcome to Dalian Huayang
    Tel:400-901-3696
    Installation Precondition for Van-lab GC
    • Release time : 2018-05-15 15:48:30
    • Browsing volume:2695

    Dear valued customers,

    Thank you for choosing our instrument, in order to better complete the installation and commissioning work of your purchased Van-lab GC, please confirm the following readiness condition before installing.

    The following to be filled by the user

    - Company name:
    - Person in charge:
    - Installation address:
    - Telephone:

    Confirm installation conditions
    1. Holders or straps for fixing instrument to avoid damage when vehicle moves.
    2. Instrument needs a stable laboratory bench space: length 100cm, width 60cm, height 70cm. If the computer is placed on the same platform, the length is needed to be lengthened correspondingly.
    3. A three-phase plug (10A).
    4. Power supply: AC 220V+/-5%, ground wire connector.

    Trainee Information
    - Name:
    - Position:
    - If trainee manipulate Windows XP
    - Whether trainee ever use the similar instrument

    DHSI Technical Department

    Copyright Dalian Huayang analytical instruments Co., Ltd.All right reserved. Preparation of Liao ICP
    友情鏈接: link1 link2 link3 link4 link5 link8 link9
    主站蜘蛛池模板: 白城市| 西华县| 钟山县| 新河县| 苏尼特右旗| 新民市| 修文县| 乌兰察布市| 深州市| 津市市| 台北县| 北安市| 铅山县| 崇左市| 德阳市| 营山县| 都江堰市| 安康市| 鲁甸县| 蕉岭县| 偃师市| 鄂伦春自治旗| 修武县| 阳江市| 青冈县| 囊谦县| 莱阳市| 托克逊县| 荥经县| 蛟河市| 德庆县| 彩票| 芦溪县| 同德县| 繁峙县| 开封县| 邵东县| 巴林右旗| 岳西县| 临邑县| 叙永县|